Since the book was written, the authors have worked on a number of research projects that have led to articles and working papers. A list is shown below. The links offer downloads of the manuscripts in PDF format. For the actual journal articles, go to the journal's site.
- Baker & Trietsch, “Safe Scheduling: Setting Due Dates in Single-Machine Problems,” European Journal of Operational Research 196 (2009) 69-77.
- Baker & Keller, “Solving the Single-Machine Tardiness Problem using Integer Programming,” Computers & Industrial Engineering 59 (2010) 730-735.
- Trietsch, et al., "A New Stochastic Engine for PERT," Working Paper (2010)
- Baker & Trietsch, “Three Heuristic Procedures for the Stochastic, Two-Machine Flow Shop Problem,” Journal of Scheduling 14 (2011) 445-454.
- Baker, “Solving Sequencing Problems in Spreadsheets,” International Journal of Planning and Scheduling 1 (2011), 3-18.
- Baker & Trietsch, “PERT 21: Fitting PERT/CPM for Use in the 21st Century,” International Journal of Project Management 30 (2012), 490–502.
- Baker & Altheimer, “Heuristic Procedures for the Stochastic Flow Shop Problem,” European Journal of Operational Research 216 (2012) 172–177.
- Trietsch et al., “Modeling Activity Times by the Parkinson Distribution with a Lognormal Core: Theory and Validation,” European Journal of Operational Research 216 (2012) 386-396.
- Baker, “Job Selection and Sequencing with Identical Tardiness Penalties,” Working Paper (2012).
- Baker, “Computational Results for the Flowshop Tardiness Problem,” Computers & Industrial Engineering 64 (2013), 812–816.
- Baker, “Minimizing Earliness and Tardiness Costs in Stochastic Scheduling,” European Journal of Operational Research 236 (2014) 445-452.
- Mazmanyan & Trietsch, “Stochastic Traveling Salesperson and Shortest Route Models with Safety Time,” Working Paper (2013).
- Baker, “Setting Optimal Due Dates in a Basic Safe Scheduling Model,” Computers & Operations Research 41 (2014) 109-114.
- Baker & Trietsch, "Trading Off Due Date Tightness and Job Tardiness in a Basic Scheduling Model," Journal of Scheduling 18 (2015) 305-309.
- Baker, "Spreadsheet-based Computations for the Flowshop Problem with Syncronous Transfers," International Journal of Planning and Scheduling 2 (2014) 77-86.